PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work fitings at the 4th floor Facing West.jpg Laying out block at the 1st floor bathrooms 133-136 Facing North.jpg Started insulating the duct work at the 2nd floor.jpg Welding the steel angle extensions at the South Elevation (2).jpg Welding the steel angle extensions at the South Elevation.jpg UCFC Site Facing South Elevation.jpg
Previous pageNext page Welding the steel angle extensions at the South Elevation
Welding the steel angle extensions at the South Elevation